Permitted development rights for microgeneration equipment extended in Wales | Practical Law

Permitted development rights for microgeneration equipment extended in Wales | Practical Law

The Town and Country Planning (General Permitted Development) (Amendment) (Wales) Order 2012 has been made. The Order will, from 18 June 2012, confer permitted development rights for the installation of specified types of microgeneration equipment on or within the curtilage of residential properties in Wales.

Permitted development rights for microgeneration equipment extended in Wales

Practical Law UK Legal Update 6-519-6895 (Approx. 3 pages)

Permitted development rights for microgeneration equipment extended in Wales

by PLC Property
Published on 31 May 2012Wales
The Town and Country Planning (General Permitted Development) (Amendment) (Wales) Order 2012 has been made. The Order will, from 18 June 2012, confer permitted development rights for the installation of specified types of microgeneration equipment on or within the curtilage of residential properties in Wales.