Permitted development rights for microgeneration equipment extended in Wales | Practical Law
The Town and Country Planning (General Permitted Development) (Amendment) (Wales) Order 2012 has been made. The Order will, from 18 June 2012, confer permitted development rights for the installation of specified types of microgeneration equipment on or within the curtilage of residential properties in Wales.