A Checklist identifying key drafting considerations for an owner to avoid contract disputes and contractor claims that impair the owner's ability to achieve the intended budget certainty of a design-bid-build contract with a fixed or lump sum price (sometimes referred to as a stipulated sum) for the performance of the physical construction.