COVID-19: Injunction preventing adjudication proceeding refused (TCC) | Practical Law
In MillChris Developments Ltd v Waters [2020] 4 WLUK 45, Jefford J in the Technology and Construction Court (TCC) has refused to grant an injunction to prevent an adjudication from continuing, rejecting arguments that the COVID-19 lockdown was sufficient reason to postpone the adjudication until after the lockdown ended.