COVID-19: construction and engineering FAQs | Practical Law

COVID-19: construction and engineering FAQs | Practical Law

Frequently asked questions about the construction law implications of the 2019 novel coronavirus disease (COVID-19) pandemic. To reflect the reduction in COVID-19 restrictions in England and Wales, this resource is no longer maintained.

COVID-19: construction and engineering FAQs

Practical Law UK Practice Note w-024-6022 (Approx. 85 pages)

COVID-19: construction and engineering FAQs

Law stated as at 01 Apr 2022England, Wales
Frequently asked questions about the construction law implications of the 2019 novel coronavirus disease (COVID-19) pandemic. To reflect the reduction in COVID-19 restrictions in England and Wales, this resource is no longer maintained.